
rodanthe bridge
utilized a Top-down construction method, minimizing environmental footprint. Jug handle design bypasses critical portion of the barrier island and elevates an evacuation route (Hwy 12) from typical flood levels.
Details
Location: Rodanthe, NC (Outer Banks)
Owner: North Carolina DOT
Customer: Flatiron
Precast Value: $25 million
product
30” Square Piles (50)
54” Cylinder Piles (294)
45” Florida I-Beams (88),
72” Florida I-Beams (300),
24” Voided Slabs (140)
Sheet Piles (146)
5” Deck Panels (4,617).