tappan zee bridge
tappan zee soffit slabs
Each fully constructed Soffit Slab were the size of a football field and was lowered into the water all at once. Each piece that contributed to the constructed soffit weighed approx. 50-tons to 95-tons individually.
product
Soffit Slabs (QTY: 82)
tappan zee Pier caps
Originally designed as a cast-in-place product, CPS proposed a precast design. This saved TZC additional labor expenses and shortened the construction schedule by months.
Product
300-ton Pier Caps (QTY: 59) measuring up to 92’ Long x 10’-6” Wide x 13’-6” Tall
tappan zee cross beams
All four beams were cast on a barge, on budget, and delivered ahead of schedule. Each beam weighed roughly 900-tons.
product
900-ton Cross Beams (QTY: 4)