
High Rise bridge (1-64)
The high rise bridge is VDOT’s largest design-build project to date. Carbon Fiber reinforcement for 36” Sq. Pile. Stainless Steel reinforcement for 36” Sq. Pile & 66” Cylinder Pile. 95” Girders reached a length of 195’ and weighed 116-Tons (delivered by barge).
Details
Location: Chesapeake, VA
Owner: Virginia DOT
Customer: Granite/Parsons/Corman Joint Venture
Product
Piles: 18” Square (18), 24” Square (23), 36” Square (258), 66” Cylinder (86).
Girders: 29” PCEF (24), 37” PCEF (26), 77” PCEF (32), 85” PCEF (10), 93” PCEF (192), 95” PCEF (74).